coloured glass
Glass Products
Factory
Brochure
Contact Us
Trade login


Factory Tour
Toughened Glass 4

 

 

6 - Toughened Glass Part B


With the investment and introduction of an in-house tempering furnace in 2002, customers requirements for toughened safety glass, can be met efficiently and quickly. Once processed and loaded onto the input rack, the glass then moves through the furnace which maintains a temperature in excess of 700 degrees centigrade.

Toughened Glass 5 Toughened Glass 6

 

Home Contact us